Internal Operating Manual
Flatland Roofing & Insulation — SOP Manual
A consolidated set of standard operating procedures for sales, insurance, production, and operations — written for the team, indexed for fast lookup, and revised quarterly.
| Manual Version | v1.0 · 2026-04-29 |
|---|---|
| Owner | Operations Manager |
| Coverage | 20 procedural SOPs · Glossary · Search |
| Tagline | Amarillo's Trusted Roofing & Insulation Experts — Proudly Serving the Texas Panhandle |
Training
- 01SOP Playbook: New-Hire TrainingExternal curriculum, internal systems, and the estimating workflow every new sales hire follows.
Sales & Marketing
- 02Sales Process Playbook: Roofing & InsulationEnd-to-end sales workflow from lead to handoff.
- 03Sales Process — Stages FlowOne-page visual map of every stage and owner.
- 04Targeting Retail Roof ReplacementsProspecting and follow-up for non-storm replacements.
- 05Insulation Sales Training: Winter FocusInspection, options, S.L.A.P. door-knock framework.
- 06Facebook Community Engagement & Lead MonitoringOrganic Facebook trust-building.
- 07Facebook Ads Follow-UpDaily VA process for paid Facebook leads.
Operations
- 08Software Tools for Residential RoofingProLine, EagleView, CompanyCam, TotalScope.
- 20Email GPS System (Tyrell + Rhowel)Inbox triage, label structure, and daily VA workflow.
Insurance & Storm
- 09Insurance Process (Storm Damage)End-to-end claim workflow with ProLine stage map.
- 10Emergency Tarping & Temporary RepairsStorm stabilization and contingency-agreement rules.
- 11From Spot Repairs to Full Roof ReplacementEscalation strategy with adjuster email template.
Production
- 12Production Playbook: Roofing17-step roofing production workflow.
- 13Production Playbook: Insulation17-step insulation production workflow.
- 14Install Day Playbook19-step install-day execution + printable checklist.
- 15Spray Foam Rig EfficiencyCrew operating standard.
- 16Spraying Foam to Tyvek (Technical Guidance)Why Flatland removes Tyvek before applying foam.
- 17Winter Weather Shingle RoofingCold-weather override rules.
- 18Final Inspection with Code DepartmentCloseout protocol with inspectors.
Repairs
- 19Internal Roof Repair ProcessOut-of-pocket repair workflow.
Reference
- CCompanion ChecklistsResponsive Yes/No field forms that mirror the SOPs for sales, production, and office use.
- GGlossaryAcronyms, tools, and shop-floor terms.
- SSearchFull-text search across every SOP.
- MConsolidated Manual (single page)Every SOP in one printable document.
Appendix (source material, not rewritten)
- Closeout Packet — existing template with placeholder text; ready to be filled in per project.
- Residential Roofing Education Manual — 18 MB reference PDF kept in the source folder.